Structure RCC framed structure as per structural design. |
Flooring Fully vitrified floors for rooms Granite flooring for staircase. |
Kitchen Granite counter top with high glazed ceramic tiles over kitchen slab, stainless steel sink. |
Toilets Ceramic tiles for walls and floors. Provision for Geyser, Hindware sanitary fittings or other good quality |
C.P Ffittings Jaquar / Equivalent. |
Doors Main Door - Elegant teak wood door Other Doors - Moulded panel door |
Windows UPVC / Wooden frames (pinkoda) with M.S Grill and glass. |
Electrical ISI specified concealed conduit copper wiring (Finolex/V-Guard). Elegant modular switches. |
Painting Internal walls - Plastic emulsion or equivalent putty finish. Exterior - Superior quality weather coat exterior paints. |
Flat No | Type Area |
Status | Type Area |
Floor Plan | Type Area |
Status | Type Area |
Status |
---|---|---|---|---|---|---|---|---|
Ground Floor - A | First Floor - B | Second Floor - C | Third Floor - D | |||||
1 | 1 BHK 537 Sq.ft |
1 BHK 537 Sq.ft |
1 BHK 537 Sq.ft |
1 BHK 537 Sq.ft |
||||
2 | 1 BHK 485 Sq.ft |
1 BHK 485 Sq.ft |
1 BHK 485 Sq.ft |
1 BHK 485 Sq.ft |
||||
3 | 2 BHK 1031 Sq.ft |
2 BHK 985 Sq.ft |
2 BHK 985 Sq.ft. |
2 BHK 985 Sq.ft |
||||
4 | 1 BHK 525 Sq.ft |
1 BHK 525 Sq.ft |
1 BHK 525 Sq.ft |
1 BHK 525 Sq.ft |
||||
5 | 1 BHK 517 Sq.ft |
1 BHK 436 Sq.ft. |
1 BHK 436 Sq.ft |
1 BHK 436 Sq.ft |
||||
6 | 1 BHK 457 Sq.ft |
1 BHK 431 Sq.ft |
1 BHK 431 Sq.ft |
1 BHK 853 Sq.ft |
||||
7 | 2 BHK 1031 Sq.ft |
1 BHK 431 Sq.ft |
1 BHK 431 Sq.ft |
1 BHK 525 Sq.ft |
||||
8 | 1 BHK 525 Sq.ft |
1 BHK 525 Sq.ft |
2 BHK 1050 Sq.ft |
|||||
9 | 1 BHK 525 Sq.ft |
1 BHK 525 Sq.ft |
2 BHK 1031 Sq.ft |
|||||
10 | 1 BHK 525 Sq.ft |
1 BHK 525 Sq.ft |
1 BHK 525 Sq.ft |
|||||
11 | 2 BHK 1031 Sq.ft |
2 BHK 1031 Sq.ft |
1 BHK 1031 Sq.ft |
|||||
12 | 1 BHK 525 Sq.ft |
1 BHK 525 Sq.ft. |
1 BHK 517 Sq.ft. |
|||||
13 | 2 BHK 1031 Sq.ft |
2 BHK 1031 Sq.ft |
1 BHK 457 Sq.ft |
|||||
14 | 1 BHK 517 Sq.ft |
1 BHK 517 Sq.ft |
||||||
15 | 1 BHK 457 Sq.ft |
1 BHK 457 Sq.ft |
||||||
Booking Advance
On Agreement
On completion of Ground floor
On completion of First floor
On completion of Second floor
On completion of Third floor
On completion of Super Structure
On Possession
- Rs.1,00,000/-
- 20% of total cost (Including 1,00,000/-)
- 15% of total cost
- 15% of total cost
- 15% of total cost
- 15% of total cost
- 15% of total cost
- 5% + Other charges
1. Registration charge, stamp duty, etc (for regn.of the land) as per actual to be paid extra.
2. Taxes, Charges for Electricity / Water connection (Govt Supply) as per actual to be paid extra.
3. Maintenance deposit as per actual to be paid extra according to the sq.ft measurement.